Systems and low-current drawing design

Review the project drawings and determine system locations, routes, and points before installation.

We begin designing systems and low-current drawings by understanding the intended use of each space, then position camera, data, communications, audio, and control points according to the required systems. We review cable routes, cabinet locations, power sources, and coordination with architectural drawings and electrical work. Early design helps establish infrastructure decisions before ceilings and walls are closed and clarifies preliminary quantities and specifications for comparing installation quotations. The level of detail, deliverables, and revisions is defined in the agreed scope; this may include point layouts, bills of quantities, coordination notes, or as-built drawings when requested. Any official approvals or engineering stamps remain subject to a qualified entity and a separate scope.

Choosing equipment locations after finishing may require exposed cabling, breaking into surfaces, or moving connection points. A lack of coordination between systems can also result in insufficient routes or conflicting equipment locations. Early planning helps reduce these changes and clarify responsibilities.

Do you provide officially approved drawings?

We provide technical concept drawings for systems. Official approval or drawing certification is offered only when available through the company and in accordance with regulatory requirements, and is confirmed in writing before work begins.

When Should I Start the Design?

Ideally before walls and ceilings are closed, as cable routes and system points are installed during the first-fix stage.

Can you design only selected systems?

Yes. The scope can be limited to the systems you need, such as cameras and networking only.

How do I send my project plan?

Send the file manually via WhatsApp using the “Send Your Project Plan” button; file uploads are not currently available on the website.