New villa system infrastructure before finishing

What to prepare for CCTV, networking, intercoms, and cable routes in a new villa before closing the walls.

The first-fix stage is the best and most cost-effective opportunity to prepare a villa's systems. After finishing, additions become limited or costly.

The Right Timing

The best time to plan is after the architectural drawings are approved and before walls and ceilings are closed, as conduits and cable routes are installed at this stage.

Systems to prepare for early

These include indoor and outdoor cameras, wired networking and Wi-Fi access points, intercoms, door and gate control, audio systems, and TV and internet infrastructure.

  • Network Points in Main Rooms
  • Central Equipment Cabinet or Room
  • Spare conduits for expansion

Start with the infrastructure, then expand

The core infrastructure can be installed first, followed by security and communications, then smart home systems later, as long as the routes are ready.

Do all systems need to be installed now?

No. Preparing the cable routes and points is enough; equipment can be installed in stages.

What if finishing work is already complete?

Some solutions remain possible but offer less flexibility; these are determined after a site survey.